ND-71548 (E) CHAPTER 5
Page 363
Issue 2
INSTALLATION TEST PROCEDURE
The following describes the procedure for confirming the normality of IP PAD. Here describes procedure for per-
forming connection test between IP Enabled D
term
and the existing terminal (D
term
and analog terminal) or the ex-
isting trunk (COT, TLT, and so on). Perform the test with the other combinations of terminals, when needed.
Note 1: It is essential that IPX and the controlled LC/TRK are in normal condition.
Note 2: Perform the test after confirming that PHD/PHA is working normally by using tests.
Figure 050-1 Diagram of IP PAD Connection Test
NAP-200-050
Sheet 1/3
IP PAD Connection Test
IP PAD
LC/ELC
TRK
MGC
(DRS)
IPX
32ch
IP Enabled D
term
Existing Terminal
PSTN
0
2
4
A
C
E
6
VC0
VC3
OPE
LINK
IP PAD (PA-32IPLB)
PZ-16VCTB
(Sub PKG0)
PZ-16VCTB
(Sub PKG1)
(*A)
(*C)
(*B)
Network Equipment
(SW HUB, Router, etc)
IP Packet
PCM
PCM
RJ45 Connector
TRK