NEC Express5800/120Ra-1 User's Guide Page 55

  • Download
  • Add to my manuals
  • Print
  • Page
    / 166
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 54
Setting Up the System 2-27
Powering On Your System
Power on your system as follows.
1. Make sure all external devices, such as a video display, keyboard, and
mouse (optional) have been connected, and the power cords are connected.
2. Power on the video display and any other external devices.
3. Open the front bezel and press the push-button power on/off switch on the
front panel. Verify that the Power/Sleep Status LED (Figure 2-7, E) is lit. If
it is not lit, ensure the ac power cord is connected to a functional ac power
source.
After a few seconds your system begins the internal Power-On Self Test
(POST). POST automatically checks the system board, CPU module, memory,
keyboard, and most installed peripheral devices.
!
CAUTION
Always allow POST to complete before powering down your
system.
!
CAUTION
The server management logic on your system board
monitors and logs system voltage changes. When powering
down your system you may experience a 1–5 second delay
from the time you press the push-button power on/off switch
on the front panel and your system powering down. This is
normal system operation and is required by the server
management logic.
If you have problems powering on your system, refer to Problem Solving in
Chapter 5 of this User’s Guide.
After you have successfully powered on your system, insert the ExpressBuilder
CD-ROM into the CD-ROM device, reboot the system and follow the screen
prompts to run ExpressBuilder.
Page view 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 165 166

Comments to this Manuals

No comments