NEC 120 User Manual

Browse online or download User Manual for Telephones NEC 120. NEC 120 User's Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 125
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews

Summary of Contents

Page 1 - NEC Australia Pty. Ltd

AD-25182501ISSUE 1.0.1Model 120Installation Procedure ManualOCTOBER, 1995NEC Australia Pty. Ltd.

Page 2

AD-25182501TABLE OF CONTENTS (CONTINUED)Page2. PROCEDURE...

Page 3 - AD-25182501

AD-25182501CHAPTER 3Page 86Revision 1.0.1NAP- 200-007Sheet 23/42Termination of Cables on MDF(b) Long Line (PN-AUCA)Figure 007-10 MDF Cross Connection

Page 4

AD-25182501 CHAPTER 3Page 87Revision 1.0.1NAP- 200-007Sheet 24/42Termination of Cables on MDF(5) Dterm /DSS Console(a) Standard Line (PN-4DLCA)Note:Ap

Page 5

AD-25182501CHAPTER 3Page 88Revision 1.0.1NAP- 200-007Sheet 25/42Termination of Cables on MDF(b) Long Line (PN-2DLCB)Note:Applies only to Dterm 65 seri

Page 6

AD-25182501 CHAPTER 3Page 89Revision 1.0.1NAP- 200-007Sheet 26/42Termination of Cables on MDF(6) SN611 ATTCON and Dterm 6D/16D series telephones.Figur

Page 7

AD-25182501CHAPTER 3Page 90Revision 1.0.1NAP- 200-007Sheet 27/42Termination of Cables on MDF(7) Day/Night Mode Change by External KeyNote:Refer to the

Page 8 - OCOTBER, 1995

AD-25182501 CHAPTER 3Page 91Revision 1.0.1NAP- 200-007Sheet 28/42Termination of Cables on MDF(8) External TAS Indicator(a) Outline of the ConnectionsF

Page 9 - Model 120

AD-25182501CHAPTER 3Page 92Revision 1.0.1NAP- 200-007Sheet 29/42Termination of Cables on MDF(b) MDF Cross Connection• When using a TAS Indicator wit

Page 10 - TABLE OF CONTENTS (CONTINUED)

AD-25182501 CHAPTER 3Page 93Revision 1.0.1NAP- 200-007Sheet 30/42Termination of Cables on MDF(c) MDF Cross Connection• When using a TAS Indicator wi

Page 11 - LIST OF ILLUSTRATIONS

AD-25182501CHAPTER 3Page 94Revision 1.0.1NAP- 200-007Sheet 31/42Termination of Cables on MDF(9) Paging EquipmentThe cross connection for customer-owne

Page 12

AD-25182501 CHAPTER 3Page 95Revision 1.0.1NAP- 200-007Sheet 32/42Termination of Cables on MDF(b) MDF Cross ConnectionNotes:1. The current capacity of

Page 13

AD-25182501LIST OF ILLUSTRATIONSFigure Title Page1-1 Reference Manuals for Installation ...

Page 14 - LIST OF TABLES

AD-25182501CHAPTER 3Page 96Revision 1.0.1NAP- 200-007Sheet 33/42Termination of Cables on MDFFigure 007-19 MDF Cross Connection for Paging Equipment (

Page 15 - CHAPTER 1 INTRODUCTION

AD-25182501 CHAPTER 3Page 97Revision 1.0.1NAP- 200-007Sheet 34/42Termination of Cables on MDF(10) External Music EquipmentThe cross connection for cus

Page 16 - AD-25182501CHAPTER 1

AD-25182501CHAPTER 3Page 98Revision 1.0.1NAP- 200-007Sheet 35/42Termination of Cables on MDF(b) MDF Cross ConnectionNotes:1. The current capacity of t

Page 17 - CHAPTER 2 GENERAL INFORMATION

AD-25182501 CHAPTER 3Page 99Revision 1.0.1NAP- 200-007Sheet 36/42Termination of Cables on MDFFigure 007-21 MDF Cross Connection for External Music Eq

Page 18 - AD-25182501CHAPTER 2

AD-25182501CHAPTER 3Page 100Revision 1.0.1NAP- 200-007Sheet 37/42Termination of Cables on MDFExternal Music Equipment (continued)• An AUSTEL-approved

Page 19 - RACK PARTS

AD-25182501 CHAPTER 3Page 101Revision 1.0.1NAP- 200-007Sheet 38/42Termination of Cables on MDF(11) External Background Music (BGM) SourceThe cross con

Page 20

AD-25182501CHAPTER 3Page 102Revision 1.0.1NAP- 200-007Sheet 39/42Termination of Cables on MDF(12) Power Failure Transfer (PFT)The PFT function is incl

Page 21 - AD-25182501 CHAPTER 2

AD-25182501 CHAPTER 3Page 103Revision 1.0.1NAP- 200-007Sheet 40/42Termination of Cables on MDF(b) MDF Cross ConnectionFigure 007-25 MDF Cross Connect

Page 22

AD-25182501CHAPTER 3Page 104Revision 1.0.1NAP- 200-007Sheet 41/42Termination of Cables on MDFFigure 007-25 MDF Cross Connection for the PFT (Continue

Page 23

AD-25182501 CHAPTER 3Page 105Revision 1.0.1NAP- 200-007Sheet 42/42Termination of Cables on MDF(13) Alarm Display Panel (ALM DSPP).Cross connection for

Page 24

AD-25182501LIST OF ILLUSTRATIONS (CONTINUED)Figure Title Page003-24 Connection of the BUS Cables...

Page 25

AD-25182501CHAPTER 3Page 106Revision 1.0.1NAP- 200-008Sheet 1/2Mounting of Circuit Cards1. Mounting Procedure(1) For testing, turn on the “SW” switch

Page 26

AD-25182501 CHAPTER 3Page 107Revision 1.0.1NAP- 200-008Sheet 2/2Mounting of Circuit CardsATTENTIONContentsStatic SensitiveHandlingPrecautions Required

Page 27

AD-25182501CHAPTER 3Page 108Revision 1.0.1NAP- 200-009Sheet 1/3System Initialization and SystemATTENTIONContentsStatic SensitiveHandlingPrecautions Re

Page 28 - 2. PROCEDURE

AD-25182501 CHAPTER 3Page 109Revision 1.0.1NAP- 200-009Sheet 2/3System Initialization and SystemATTENTIONContentsStatic SensitiveHandlingPrecautions R

Page 29

AD-25182501CHAPTER 3Page 110Revision 1.0.1NAP- 200-009Sheet 3/3System Initialization and SystemATTENTIONContentsStatic SensitiveHandlingPrecautions Re

Page 30

AD-25182501 CHAPTER 3Page 111Revision 1.0.1NAP- 200-010Sheet 1/1Operation Test1. Operation TestConfirm the system data accuracy and hardware configura

Page 31

AD-25182501LIST OF ILLUSTRATIONS (CONTINUED)Table Title Page007-15 Outline of the External TAS Indicator Connection ...

Page 32

AD-25182501LIST OF TABLESTable Title Page2-1 Description of Symbols in Trunking Diagram...

Page 33

AD-25182501 CHAPTER 1Page 1Revision 1.0.1CHAPTER 1 INTRODUCTION1. PURPOSEThis manual explains the installation procedure for the NEAX7400 ICS Model 12

Page 34

AD-25182501CHAPTER 1Page 2Revision 1.0.13. HOW TO FOLLOW THE MANUALThe Installation Procedure is shown by means of flowcharts with a NAP (NEC Action P

Page 35

AD-25182501 CHAPTER 2Page 3Revision 1.0.1CHAPTER 2 GENERAL INFORMATION1. TRUNKING DIAGRAMA typical trunking diagram for the PABX is shown in Figure 2-

Page 36

AD-25182501CHAPTER 2Page 4Revision 1.0.1Note:For details of circuit cards, refer to the Circuit Card Manual.Table 2-1: Description of Symbols in Trun

Page 37

AD-25182501 CHAPTER 2Page 5Revision 1.0.12. SYSTEM CONFIGURATIONSThe PABX system provides three kinds of installation methods as follows:• Floor Stand

Page 38

LIABILITY DISCLAIMERNEC Australia Pty. Ltd. reserves the right to change the specifica-tions, functions, or features, at any time, without notice.NEC

Page 39

AD-25182501CHAPTER 2Page 6Revision 1.0.1Figure 2-3 2-PIM Configuration for Floor Standing InstallationNote:The configuration shown applies only to in

Page 40

AD-25182501 CHAPTER 2Page 7Revision 1.0.1Figure 2-4 8-PIM Configuration for Floor Standing InstallationNote:The configuration shown applies only to i

Page 41 - Sheet 9/29

AD-25182501CHAPTER 2Page 8Revision 1.0.1Figure 2-5 1-PIM Configuration for Wall-Mounting InstallationPIMRACK PARTSBASE

Page 42

AD-25182501 CHAPTER 2Page 9Revision 1.0.1Figure 2-6: 4-PIM Configuration for 19-Inch Rack-Mounting InstallationPIM3PIM2PIM1PIM0FrontViewRearViewMDF

Page 43 - PWR SUPPLY

AD-25182501CHAPTER 3Page 10Revision 1.0.1CHAPTER 3 INSTALLATION PROCEDURE1. PRECAUTIONS1.1 Power, Ground Cabling and LIU (for Australia)(a) The power

Page 44 - Sheet 12/29

AD-25182501 CHAPTER 3Page 11Revision 1.0.11.3 Static Electricity GuardThe installer must wear a grounded wrist strap to protect circuit cards from sta

Page 45 - Sheet 13/29

AD-25182501CHAPTER 3Page 12Revision 1.0.1Figure 3-2 Static Electricity Guard (Continued)WHEN CARRYING A CIRCUITCARD AROUND, KEEP THECARD IN A CONDUCT

Page 46 - Sheet 14/29

AD-25182501 CHAPTER 3Page 13Revision 1.0.11.4 Procedure for Unplugging/Plugging Circuit CardsWhen removing a circuit card from the PIM, or when mounti

Page 47 - Sheet 15/29

AD-25182501CHAPTER 3Page 14Revision 1.0.12. PROCEDUREThis section explains the procedures for installing the PABX system. The installer should follow

Page 48 - Sheet 16/29

AD-25182501 CHAPTER 3Page 15Revision 1.0.1Figure 3-3 Procedure Flowchart (Continued)The mark shown below is attached to the NAP sheet for each proced

Page 49 - Sheet 17/29

87654321.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1ISSUENo.37 38 39 40 41 42 43 44 45 46 47 48 49 50PAGE

Page 50

AD-25182501CHAPTER 3Page 16Revision 1.0.1ATTENTIONContentsStatic SensitiveHandlingPrecautions RequiredNAP- 200-001Sheet 1/1Unpacking1. Unpacking Proc

Page 51 - Sheet 19/29

AD-25182501 CHAPTER 3Page 17Revision 1.0.1NAP- 200-002Sheet 1/2Marking and Drilling1. Confirmation of the Equipment LayoutInstall the equipment in an

Page 52

AD-25182501CHAPTER 3Page 18Revision 1.0.1NAP- 200-002Sheet 2/2Marking and Drilling2.2 Wall-Mounting• Locate and mark the wall mounting points as show

Page 53

AD-25182501 CHAPTER 3Page 19Revision 1.0.1NAP- 200-003Sheet 1/29Installation of Main Equipment1. Installation of ModulesInstall modules according to

Page 54

AD-25182501CHAPTER 3Page 20Revision 1.0.1NAP- 200-003Sheet 2/29Installation of Main Equipment1.2 Floor Standing Installation(1) Connect the RACK PART

Page 55

AD-25182501 CHAPTER 3Page 21Revision 1.0.1NAP- 200-003Sheet 3/29Installation of Main Equipment(2) When the system is a multiple-PIM configuration, co

Page 56

AD-25182501CHAPTER 3Page 22Revision 1.0.1NAP- 200-003Sheet 4/29Installation of Main Equipment(3) Connect the PIM to the RACK PARTS as shown in Figure

Page 57

AD-25182501 CHAPTER 3Page 23Revision 1.0.1NAP- 200-003Sheet 5/29Installation of Main Equipment(4) When the system is a multiple-PIM configuration, co

Page 58

AD-25182501CHAPTER 3Page 24Revision 1.0.1NAP- 200-003Sheet 6/29Installation of Main Equipment 1.3 Wall-Mounting Installation(1) Locate the four mount

Page 59

AD-25182501 CHAPTER 3Page 25Revision 1.0.1NAP- 200-003Sheet 7/29Installation of Main Equipment(2) Using four appropriate fasteners for the type of wal

Page 60

87654321.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1ISSUENo.93 94 95 96 97 98 99 100 101 102 103 104 105 1

Page 61 - Sheet 29/29

AD-25182501CHAPTER 3Page 26Revision 1.0.1NAP- 200-003Sheet 8/29Installation of Main Equipment(3) Attach four M4 machine screws (provided) to the RACK

Page 62

AD-25182501 CHAPTER 3Page 27Revision 1.0.1NAP- 200-003Sheet 9/29Installation of Main EquipmentFigure 003-9 Screwing the RACK PARTS to a Wall350350250

Page 63

AD-25182501CHAPTER 3Page 28Revision 1.0.1NAP- 200-003Sheet 10/29Installation of Main Equipment(6) When mounting the RACK PARTS to a wall, connect all

Page 64

AD-25182501 CHAPTER 3Page 29Revision 1.0.1NAP- 200-003Sheet 11/29Installation of Main Equipment(7) For floor and wall-mounted installations, refer to

Page 65

AD-25182501CHAPTER 3Page 30Revision 1.0.1NAP- 200-003Sheet 12/29Installation of Main EquipmentFigure 003-13 Modular Layout for 3 PIM Configuration-+-

Page 66

AD-25182501 CHAPTER 3Page 31Revision 1.0.1NAP- 200-003Sheet 13/29Installation of Main EquipmentFigure 003-14 Modular Layout for 4 PIM Configuration-+

Page 67

AD-25182501CHAPTER 3Page 32Revision 1.0.1NAP- 200-003Sheet 14/29Installation of Main EquipmentFigure 003-15 Modular Layout for 5 PIM ConfigurationNot

Page 68

AD-25182501 CHAPTER 3Page 33Revision 1.0.1NAP- 200-003Sheet 15/29Installation of Main EquipmentFigure 003-16 Modular Layout for 6 PIM ConfigurationNo

Page 69

AD-25182501CHAPTER 3Page 34Revision 1.0.1NAP- 200-003Sheet 16/29Installation of Main EquipmentFigure 003-17 Modular Layout for 7 PIM ConfigurationNot

Page 70

AD-25182501 CHAPTER 3Page 35Revision 1.0.1NAP- 200-003Sheet 17/29Installation of Main EquipmentFigure 003-18 Modular Layout for 8 PIM Configuration10

Page 71

87654321ISSUENo.PAGE N0.87654321ISSUENo.PAGE N0.87654321ISSUENo.PAGE N0.87654321.0.1 1.0.1 1.0.1 1.0.1 1.0.1 1.0.1ISSUENo.107 108 109 110 111PAGE N0.I

Page 72

AD-25182501CHAPTER 3Page 36Revision 1.0.1NAP- 200-003Sheet 18/29Installation of Main Equipment1.4 19-Inch Rack-Mounting Installation1.3.1 NEC Australi

Page 73 - Connection of Battery

AD-25182501 CHAPTER 3Page 37Revision 1.0.1NAP- 200-003Sheet 19/29Installation of Main EquipmentFigure 003-19 1 PIM Configuration (19”Rack Mount)PIM0+

Page 74 - CAUTION:

AD-25182501CHAPTER 3Page 38Revision 1.0.1NAP- 200-003Sheet 20/29Installation of Main EquipmentFigure 003-20 2 PIM Configuration (19”Rack Mount)PIM0+

Page 75 - CHAPTER 3

AD-25182501 CHAPTER 3Page 39Revision 1.0.1NAP- 200-003Sheet 21/29Installation of Main EquipmentFigure 003-21 3 PIM Configuration (19”Rack Mount)PIM0+

Page 76

AD-25182501CHAPTER 3Page 40Revision 1.0.1NAP- 200-003Sheet 22/29Installation of Main EquipmentFigure 003-22 4 PIM Configuration (19”Rack Mount)PIM0+

Page 77

AD-25182501 CHAPTER 3Page 41Revision 1.0.1NAP- 200-003Sheet 23/29Installation of Main Equipment2.1 Cable Connections and Switch Settings on PZ-PW86Not

Page 78

AD-25182501CHAPTER 3Page 42Revision 1.0.1NAP- 200-003Sheet 24/29Installation of Main Equipment2.2 Cable Connections and Switch Settings on PZ-PW86(A)N

Page 79

AD-25182501 CHAPTER 3Page 43Revision 1.0.1NAP- 200-003Sheet 25/29Installation of Main Equipment(1) Confirm the connection of the PWR CNT CA-A and powe

Page 80 - (b) LEN 0256 ~ 0511

AD-25182501CHAPTER 3Page 44Revision 1.0.1NAP- 200-003Sheet 26/29Installation of Main Equipment(2) The AC CORD-A (AC Power Cable) wiring to the PZ-PW8

Page 81

AD-25182501 CHAPTER 3Page 45Revision 1.0.1NAP- 200-003Sheet 27/29Installation of Main Equipment(3) When the system is a multiple-PIM configuration, mo

Page 82 - (b) PIM1 (LTC0 ~ LTC2)

IMPORTANT SAFETY CONSIDERATIONS1. Never install telephone wiring during a lightning storm.2. Never install telephone jacks in wet locations unless the

Page 83 - (c) PIM2 (LTC0 ~ LTC2)

AD-25182501CHAPTER 3Page 46Revision 1.0.1NAP- 200-003Sheet 28/29Installation of Main Equipment(4) When the system is a multiple-PIM configuration, con

Page 84 - (d) PIM3 (LTC0 ~ LTC2)

AD-25182501 CHAPTER 3Page 47Revision 1.0.1NAP- 200-003Sheet 29/29Installation of Main EquipmentFigure 003-29 Connection of the BUS CablesPIM7PIM6PIM5

Page 85 - (e) PIM4 (LTC0 ~ LTC2)

AD-25182501CHAPTER 3Page 48Revision 1.0.1NAP- 200-004Sheet 1/9Installation of PeripheralEquipment1. Installation of SN694 ATTCON(1) Screw the handset

Page 86 - (f) PIM5 (LTC0 ~ LTC2)

AD-25182501 CHAPTER 3Page 49Revision 1.0.1ATTENTIONContentsStatic SensitiveHandlingPrecautions RequiredNAP- 200-004Sheet 2/9Installation of Peripheral

Page 87 - (g) PIM6 (LTC0 ~ LTC2)

AD-25182501CHAPTER 3Page 50Revision 1.0.1ATTENTIONContentsStatic SensitiveHandlingPrecautions RequiredNAP- 200-004Sheet 3/9Installation of PeripheralE

Page 88 - (h) PIM7 (LTC0 ~ LTC2)

AD-25182501 CHAPTER 3Page 51Revision 1.0.1ATTENTIONContentsStatic SensitiveHandlingPrecautions RequiredNAP- 200-004Sheet 4/9Installation of Peripheral

Page 89

AD-25182501CHAPTER 3Page 52Revision 1.0.1NAP- 200-004Sheet 5/9Installation of PeripheralEquipment2. Installation of SN611 ATTCON(1) Screw the handset

Page 90

AD-25182501 CHAPTER 3Page 53Revision 1.0.1ATTENTIONContentsStatic SensitiveHandlingPrecautions RequiredNAP- 200-004Sheet 6/9Installation of Peripheral

Page 91

AD-25182501CHAPTER 3Page 54Revision 1.0.1ATTENTIONContentsStatic SensitiveHandlingPrecautions RequiredNAP- 200-004Sheet 7/9Installation of PeripheralE

Page 92

AD-25182501 CHAPTER 3Page 55Revision 1.0.1ATTENTIONContentsStatic SensitiveHandlingPrecautions RequiredNAP- 200-004Sheet 8/9Installation of Peripheral

Page 93 - (decadic and MFC)

A. When the power supply cord or plug is damaged or frayed.B. If liquid has been spilled into the product.C. If the product has been exposed to rain o

Page 94 - Sheet 17/42

AD-25182501CHAPTER 3Page 56Revision 1.0.1ATTENTIONContentsStatic SensitiveHandlingPrecautions RequiredNAP- 200-004Sheet 9/9Installation of PeripheralE

Page 95

AD-25182501 CHAPTER 3Page 57Revision 1.0.1NAP- 200-005Sheet 1/4Connection of Battery1. Internal Battery Connection(1) Mount a battery unit (24V, 3.4

Page 96 - Sheet 19/42

AD-25182501CHAPTER 3Page 58Revision 1.0.1NAP- 200-005Sheet 2/4Connection of Battery(3) Plug the battery-cable connector into the BATT1 connector on t

Page 97 - (b) LD Trunk (PN-2LDTA)

AD-25182501CHAPTER 3Page 59Revision 1.0.1NAP- 200-005Sheet 3/4Connection of Battery(6) When the system is a multiple PIM configuration, provide the fo

Page 98

AD-25182501CHAPTER 3Page 60Revision 1.0.1NAP- 200-005Sheet 4/4Connection of Battery2. External Battery ConnectionWhen using an external battery, provi

Page 99

AD-25182501CHAPTER 3Page 61Revision 1.0.1NAP- 200-006Sheet 1/3Cable Running to MDF1. Cable Running to MDF(1) Usually a pre-wired MDF is provided ex-fa

Page 100 - Revision 1.0.1

AD-25182501CHAPTER 3Page 62Revision 1.0.1NAP- 200-006Sheet 2/3Cable Running to MDFTable 006-1: MDF Cables for PIMFROMCABLE NUMBERTOCABLE DESIGNATIONM

Page 101 - AD-25182501 CHAPTER 3

AD-25182501CHAPTER 3Page 63Revision 1.0.1NAP- 200-006Sheet 3/3Cable Running to MDF(3) For connection to an existing MDF, bring the MDF cables into the

Page 102

AD-25182501CHAPTER 3Page 64Revision 1.0.1NAP- 200-007Sheet 1/42Termination of Cables on MDF1. Cable Connection to MDF(1) Connect the cables to the MDF

Page 103

AD-25182501CHAPTER 3Page 65Revision 1.0.1NAP- 200-007Sheet 2/42Termination of Cables on MDF(2) Figure 007-2 shows the relationship between Line Equipm

Page 104

AD-25182501ISSUE 1.0.1OCOTBER, 1995NEAX7400 ICSModel 120Installation Procedure ManualCHAPTERINTRODUCTION 1GENERAL INFORMATION 2INSTALLATION PROCEDURE

Page 105

AD-25182501CHAPTER 3Page 66Revision 1.0.1NAP- 200-007Sheet 3/42Termination of Cables on MDF(b) LEN 0256 ~ 0511Figure 007-2: Location of LEN (Continue

Page 106

AD-25182501CHAPTER 3Page 67Revision 1.0.1NAP- 200-007Sheet 4/42Termination of Cables on MDF(3) Figure 007-3 shows the LTC Connector Pin Arrangement.(a

Page 107

AD-25182501CHAPTER 3Page 68Revision 1.0.1NAP- 200-007Sheet 5/42Termination of Cables on MDF(b) PIM1 (LTC0 ~ LTC2)Figure 007-3: LTC Connector Pin Arra

Page 108

AD-25182501 CHAPTER 3Page 69Revision 1.0.1NAP- 200-007Sheet 6/42Termination of Cables on MDF(c) PIM2 (LTC0 ~ LTC2)Figure 007-3: LTC Connector Pin Arr

Page 109 - Line Isolation Unit

AD-25182501CHAPTER 3Page 70Revision 1.0.1NAP- 200-007Sheet 7/42Termination of Cables on MDF(d) PIM3 (LTC0 ~ LTC2)Figure 007-3: LTC Connector Pin Arra

Page 110 - NAP- 200-007

AD-25182501 CHAPTER 3Page 71Revision 1.0.1NAP- 200-007Sheet 8/42Termination of Cables on MDF(e) PIM4 (LTC0 ~ LTC2)Figure 007-3: LTC Connector Pin Arr

Page 111

AD-25182501CHAPTER 3Page 72Revision 1.0.1NAP- 200-007Sheet 9/42Termination of Cables on MDF(f) PIM5 (LTC0 ~ LTC2)Figure 007-3: LTC Connector Pin Arra

Page 112

AD-25182501 CHAPTER 3Page 73Revision 1.0.1NAP- 200-007Sheet 10/42Termination of Cables on MDF(g) PIM6 (LTC0 ~ LTC2)Figure 007-3: LTC Connector Pin Ar

Page 113 - Sheet 36/42

AD-25182501CHAPTER 3Page 74Revision 1.0.1NAP- 200-007Sheet 11/42Termination of Cables on MDF(h) PIM7 (LTC0 ~ LTC2)Figure 007-3: LTC Connector Pin Arr

Page 114 - Page 100

AD-25182501 CHAPTER 3Page 75Revision 1.0.1NAP- 200-007Sheet 12/42Termination of Cables on MDF2. MDF Cross ConnectionsCross connections on the MDF for

Page 115

AD-25182501AD-25182501ISSUE 1OCTOBER, 1995NEAX7400 ICSModel 120Installation Procedure ManualTABLE OF CONTENTSPageLIST OF ILLUSTRATIONS...

Page 116 - Page 102

AD-25182501CHAPTER 3Page 76Revision 1.0.1NAP- 200-007Sheet 13/42Termination of Cables on MDFTable 007-2 LTC0-LTC2 MDF Cross Connection Information (Co

Page 117 - (b) MDF Cross Connection

AD-25182501 CHAPTER 3Page 77Revision 1.0.1NAP- 200-007Sheet 14/42Termination of Cables on MDFTable 007-2 LTC0-LTC2 MDF Cross Connection Information (C

Page 118 - Page 104

AD-25182501CHAPTER 3Page 78Revision 1.0.1NAP- 200-007Sheet 15/42Termination of Cables on MDFTable 007-2 LTC0-LTC2 MDF Cross Connection Information (Co

Page 119 - Page 105

AD-25182501 CHAPTER 3Page 79Revision 1.0.1NAP- 200-007Sheet 16/42Termination of Cables on MDF(1) C.O./D.I.D. Trunks(a) 4 Line C.O. Trunks (PN-4COTE an

Page 120

AD-25182501CHAPTER 3Page 80Revision 1.0.1NAP- 200-007Sheet 17/42Termination of Cables on MDF(b) 2 Line C.O. Trunk (PN-2COTD)Figure 007-5: MDF Cross C

Page 121 - Precautions Required

AD-25182501 CHAPTER 3Page 81Revision 1.0.1NAP- 200-007Sheet 18/42Termination of Cables on MDF(2) Tie Line Trunk(a) 4W E&M Trunk (PN-2ODTA)Figure 0

Page 122

AD-25182501CHAPTER 3Page 82Revision 1.0.1NAP- 200-007Sheet 19/42Termination of Cables on MDFFigure 007-6 MDF Cross Connection for a 4W E&M Trunk

Page 123

AD-25182501 CHAPTER 3Page 83Revision 1.0.1NAP- 200-007Sheet 20/42Termination of Cables on MDF(b) LD Trunk (PN-2LDTA)Figure 007-7: MDF Cross Connectio

Page 124

AD-25182501CHAPTER 3Page 84Revision 1.0.1NAP- 200-007Sheet 21/42Termination of Cables on MDF(3) 2 Line DID Trunk (PN-AUCA)Figure 007-8 MDF Cross Conn

Page 125 - Page 111

AD-25182501 CHAPTER 3Page 85Revision 1.0.1NAP- 200-007Sheet 22/42Termination of Cables on MDF(4) Single Line Telephone (SLT)(a) Standard Line (PN-4L

Comments to this Manuals

No comments