NEC 120 User Manual Page 45

  • Download
  • Add to my manuals
  • Print
  • Page
    / 125
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 44
AD-25182501 CHAPTER 3
Page 31
Revision 1.0.1
NAP- 200-003
Sheet 13/29
Installation of Main Equipment
Figure 003-14 Modular Layout for 4 PIM Configuration
-
+
-
+
-
+
PS12260
-
+
SHELF 1
MIN. BACKUP,
26 A-H
SHELF 2
MED. BACKUP
(SHELF 1+2),
52 A-H
PWR SUPPLY
LTC0
LTC1
LTC2
MDF0(L)
MDF0(L)
MDF0(L)
Power Board
BATTM0
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
MDF0
or
TPF0
PIM1
LTC0
LTC1
LTC2
PWR SUPPLY
100
Pair
(L)
Notes: - MDF cable lengths are 1.5 metres
- PIM 3 - LTC 0-2 connect to (L) Krone 
(MDF 1).
- 240V connects to 4 way power board.
- BATTM0 can be supplied for external 
battery backup either as MIN. or MED. 
backup configuration.
- If BATTM0 is not required use dummy 
module.
- If a 78 A-H battery is required, add 
another BATTM.
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
100
Pair
(L)
MDFO(L)
MDF0(R)
MDFO(R)
+
-
240V AC
PIM0
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
MDF1
or
TPF1
PIM2
LTC1
LTC2
PWR SUPPLY
100
Pair
(L)
MDF0(R)
MDF0(R)
MDF1(L)
PIM3
LTC1
LTC2
PWR SUPPLY
MDF1(L)
MDF1(L)
MDF1(L)
LTC0
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
10 Pair
LTC0
Page view 44
1 2 ... 40 41 42 43 44 45 46 47 48 49 50 ... 124 125

Comments to this Manuals

No comments